SPN engineer performing a Seismic Integrity Test on a pile head with a hammer and wave sensor on an actual site
A Seismic Integrity Test is performed by striking the pile head with a hand-held hammer and measuring the reflected wave with a sensor on the pile head (photo: SPN Soil Engineering)

What are Seismic Integrity Test results read from?

The Seismic Integrity Test (or Low Strain Pile Integrity Test) is read from a plot of wave velocity (Velocity) versus time. The pile head is struck with a hand-held hammer, and a stress wave travels down the pile. When it meets a change in cross-section or concrete quality (Impedance Change), part of the wave reflects back up to be picked up by the sensor on the pile head.

The location of whatever the wave meets is calculated with a simple equation:

📐 Depth equation

Depth = (wave speed × reflection return time) ÷ 2
The wave speed in typical concrete piles is about 3,500–4,000 m/s, depending on the concrete strength and age.
Hypothetical example: wave speed 4,000 m/s and a reflection returning at 0.010 s → depth = 4,000 × 0.010 ÷ 2 = 20 m

Testing and interpretation in Thailand mainly reference DPT 1551-51. The international method ASTM D5882-16 was withdrawn by ASTM in 2025, so if it is cited in documents, state the edition year and its status.

Seismic testing is fast and economical, so it is widely used to screen the integrity of large numbers of piles on a project (see the basics of the method in What Is a Seismic Integrity Test)

What does the graph of a normal pile look like?

The graph of a sound pile has two main wave peaks: the Impact Pulse at the pile head and the Toe Reflection at the design length, with a flat section in between.

  1. Impact Pulse — the first peak from the hammer blow, near zero (the pile head)
  2. Toe Reflection — the reflection from the pile toe, appearing at the position matching the design pile length (e.g. a 21 m pile should show a reflection at about 21 m)

Between these two points, the graph should be flat, with no distinct spurious peaks, meaning the pile cross-section is uniform along its length.

Example Seismic Test graph of a sound pile, showing the Impact Pulse at the pile head and a clear Toe Reflection at 7 m matching the model pile length, from DPT 1551-51
Sound pile — the impact peak (0 m) and the Toe Reflection at ~7 m, matching the length of the model pile, with a flat middle section (source: DPT 1551-51 Appendix D, Department of Public Works and Town & Country Planning — tests on model piles)

Which graphs indicate a pile defect?

A graph with a wave reflecting back before the pile toe indicates that the cross-section or concrete may change at that depth. The direction of the reflection relative to the Impact Pulse tells the type: the same direction means a reduced cross-section, the opposite direction means an enlarged cross-section. The table below summarizes 5 common patterns.

← Scroll to see the full table →

Signal pattern on the graphPossible meaningCommon in
Reflection in the same direction as the Impact Pulse before the pile toeReduced cross-section — necking (Necking), crack (Crack), void (Void), poor-quality concreteBored piles through soft soil / cracked driven piles
Reflection in the opposite direction to the Impact PulseEnlarged cross-section — bulging (Bulging) from concrete flowing out into soft soil layersWet-process bored piles
Rhythmic repeated reflections from a single locationA clearly separated crack or joint; most of the wave reflects back at that pointMulti-section driven piles / piles cracked by overdriving
No Toe Reflection at the design lengthThe wave is fully absorbed before reaching the toe (long pile/high friction), or a major defect blocks itLong piles in stiff clay
Toe Reflection appears shallower than the design lengthThe actual pile may be shorter than designed, or fully cracked through at that pointMust be checked against construction records

Real signal examples from tests on model piles in DPT 1551-51 Appendix D make each case easier to picture.

Example Seismic Test graph of a pile with a reduced cross-section (Necking): a reflection in the same direction as the Impact Pulse appears before the pile toe, from DPT 1551-51
Reduced cross-section (Necking) — a reflection in the same direction as the first peak, appearing mid-pile before the Toe Reflection (source: DPT 1551-51 Appendix D)
Example Seismic Test graph of a cracked pile: a clear reflection from the crack appears before the pile toe, from DPT 1551-51
Cracked pile — a clear, high-amplitude reflection from the crack, because most of the wave reflects back at the crack (source: DPT 1551-51 Appendix D)
Example Seismic Test graph of a pile with an increased cross-section (Bulging): a reflection in the opposite direction to the Impact Pulse, from DPT 1551-51
Increased cross-section (Bulging) — a reflection in the opposite direction to the first peak (dipping down first, then rising), unlike a reduced cross-section (source: DPT 1551-51 Appendix D)
⚠️ Important caution

The same signal pattern can have several causes. For example, a mid-pile reflection may simply be a normal driven-pile joint rather than a crack. Conclusions must therefore be drawn by an engineer who reviews all supporting data: pile type, driving/concreting records and soil profile data.

Example Seismic Test graph of a spliced pile: the reflection from the joint resembles a defect signal, from DPT 1551-51
Spliced pile — a joint can produce a mid-pile reflection resembling a crack, a clear example of why the graph must be compared with the recorded joint locations before concluding (source: DPT 1551-51 Appendix D)

Once you know the signal patterns, the figure below arranges graph reading into 3 questions: is the signal reliable, is the Toe Reflection seen at the design length, and is there a reflection before the toe and in which direction. Each answer leads to a result group from the table above, along with what to do next.

Three-step sequence for reading Seismic Integrity Test results, from checking signal quality, the Toe Reflection and the direction of reflections, to grouping results and next actions (illustrative example) Conceptual decision chart for reading Seismic Integrity Test graphs. The left column holds three questions arranged from top to bottom, each with a small graph. Step one: is the signal sharp and repeatable on every blow? If not, the result cannot yet be read because of high noise; grind the pile head surface and retest at several points. Step two: is the reflection from the pile toe seen at the design length? If it appears shallower than designed, the pile may be shorter than designed or fully cracked at that point; compare with construction records and investigate further by core drilling. If the toe is not seen, the wave may have been absorbed by the soil or blocked by a major defect; consider the soil profile and the pile length-to-size ratio, and confirm the length by another method such as Parallel Seismic. Step three: once the toe is seen at the design length, check whether there is a reflection before the toe and its direction relative to the Impact Pulse. If none and the graph is flat, the pile is classified as sound and the result is recorded in the report, but this does not indicate load capacity, which requires PDA or a Static Load Test. A reflection in the same direction as the Impact Pulse means a reduced cross-section such as necking, a crack, a void or poor concrete; retest, test neighboring piles, then investigate further with Coring or CSL and refer to an engineer. A reflection in the opposite direction means an enlarged cross-section or bulging from concrete flowing out into soft soil; compare with the actual concrete volume placed. Rhythmic repeated reflections from one location may be a separated crack or joint; compare with the joint locations from the driving record. Every small graph has a dashed line marking the design pile toe. The bottom bar stresses that this is an illustrative example, that the same pattern can have several causes, and that deciding whether a pile is acceptable or needs remediation rests with the project's responsible engineer. Reading a Seismic Test in order: 3 questions → result group → next step Not to scale Reading sequence Sign Result group · possible meaning Next step Not yet readable High noise, not repeatable Grind the pile head and retest at several pts Pile shorter? or cracked through there Check build records Investigate (Coring) Toe not readable Soil damping / major defect Check soil + L/D Verify length otherwise Sound pile Clear toe, flat middle Record in report Capacity? → PDA/Static Reduced section Neck, crack, void, poor concrete Retest + adjacent piles Coring / CSL → engineer Enlarged (bulge) Concrete flow into soft soil Compare concrete volume placed Crack / separated joint Most of wave reflects at 1 pt Compare joint depths with driving record 1 Sharp, repeatable signal? Several blows Traces overlap 2 Toe Reflection seen at design length? L Toe at L 3 Reflection before the toe? Direction vs Impact Pulse Check mid-graph Impact Pulse Pile toe Same as Impact Pulse = reduced section Opposite Impact Pulse = enlarged section No Too shallow Not seen None Same dir. Opposite Repeating Yes Seen at L Dashed line in mini-graphs = design toe (L) Conceptual example · Not measured data Same pattern, many causes OK/remediate = project engineer decides
Three-step reading of Seismic Integrity Test results: signal quality → Toe Reflection → direction of reflections before the toe, then grouping of results with next actions — the small graphs are illustrative, not measured values; the final decision rests with the project's responsible engineer

What makes graphs hard to read (not always a defect)?

Some factors create defect-like signals or weaken the Toe Reflection even though the pile may not be damaged. These factors are why signal quality is checked first (question 1 in the figure above).

Sensor for reflected-wave signals mounted on a pile head during a Seismic Integrity Test on an actual site
The sensor on the pile head records reflected signals for interpretation on the Velocity–Time graph — the condition of the pile head surface directly affects signal clarity (photo: SPN Soil Engineering)
  • Uneven pile head or loose, spalling concrete — high noise; fix by grinding the pile head before testing (see Pile Head Preparation Before Testing)
  • Very long pile relative to its cross-section — soil friction absorbs the wave until the Toe Reflection fades or disappears
  • Abrupt changes in soil layers — sudden changes in friction can create defect-like reflections
  • Testing when the concrete is too young — the wave speed is low and unstable, so calculated positions are inaccurate

What limitations of the seismic test should you know before concluding?

The Seismic Integrity Test is an integrity screening tool, not a load capacity test, and it has 3 key limitations.

  1. It cannot tell load capacity — it only shows the integrity of the pile shaft. To confirm load capacity, a Dynamic Load Test (PDA) or Static Load Test is required.
  2. Very small defects may go undetected — especially very deep defects or ones that are small relative to the pile cross-section
  3. Defects below the first defect cannot be seen — if there is a major crack in the upper part, most of the wave reflects back, and data below that point is unreliable

Abnormal signal found: what next?

Do not conclude straight away that the pile is defective. The first step is to confirm that the signal really comes from the pile, then investigate in depth only the piles that remain abnormal. Engineers usually proceed in this order:

  1. Retest the same pile at several positions on the pile head to confirm that the signal really comes from the pile and is not noise
  2. Compare with construction records such as the actual concrete volume placed, driving records and pile joint locations
  3. Test additional neighboring piles to see whether the problem is limited to one pile or affects the whole zone
  4. Investigate in depth with other methods such as concrete core drilling (Coring) or Cross Hole Sonic Logging (CSL) for large bored piles with pre-installed access tubes; where no Toe Reflection is seen and the length must be confirmed, a Parallel Seismic Test may be used
  5. Refer the results to the design engineer — deciding whether a pile is acceptable or needs remediation is the authority of the project's responsible engineer

The 3D view below shows an illustrative grouping of results into 4 levels: green is sound, orange needs comparison with construction data (bulging, joints), red is a suspected defect (necking, cracks), and gray is unreadable and must be retested.

3D model of a row of piles in a soil section, each in a different condition, with color-coded Seismic Test result tags on the pile heads and next actions for each level (conceptual illustration) Conceptual 3D view of a soil block cut away to show soft clay, stiff clay and sand layers, with five piles in a row in the section. The first three are bored piles. Pile one is sound along its full length, with wave arrows traveling down and reflecting back from the toe, tagged green as sound. Pile two has necking in the soft clay layer, with the wave reflecting back up before reaching the toe, tagged red. Pile three has a bulge from concrete flowing out into soft soil, tagged orange. The last two are precast square driven piles. Pile four has a crack across its section, tagged red. Pile five has a steel splice joint between sections, which gives a defect-like reflection, tagged orange. Behind them at the ground surface is another pile head with a rough surface, tagged gray as unreadable. A panel on the right explains each level and the next action. Green, sound: record the result in the report, but it does not indicate load capacity. Orange, needs data comparison, e.g. bulging or a joint: compare with the actual concrete volume placed or the driving record, and retest at several points on the pile head. Red, suspected defect, e.g. necking, a crack or a Toe shallower than designed: retest, test neighboring piles, then investigate further with Coring or CSL and have an engineer review. Gray, unreadable because of noise or no visible toe: grind the pile head and retest, and consider the soil profile or confirm by another method. The panel ends by stressing that deciding whether a pile is acceptable or needs remediation rests with the project's responsible engineer. 3D model: condition of each pile → result tag → next step Not to scale Sound Necking Bulge Crack Joint Rough Bored pile Necking/bulge: often in soft soil Precast driven piles Driving crack · splice joint Soft clay Stiff clay Sand Wave travels down, reflects at toe Necking: reflects before toe = where signal suggests an anomaly Each level → next step Sound Clear toe at L · flat middle → Record in report (does not show capacity) Compare data Bulge / driven-pile joint → Check concrete vol. · driving log → Retest at several pts on head Likely defect Neck · crack · toe shallower → Retest + test adjacent piles → Coring / CSL, then engineer review Unreadable Noise · toe not seen → Grind head and retest → Check soil / verify otherwise Acceptable or remediate? The project engineer decides Conceptual · not real test results
3D model: piles in a soil section in different conditions, with color-coded result tags on the pile heads and next actions for each level — a conceptual illustration, not real test results; actual criteria follow the project specifications and the responsible engineer
🔗 Read more

If a pile fails the seismic test, read the detailed guidance in Pile Failed a Seismic Test: What to Do, and see an overview of choosing among all test methods in All Pile Testing Methods

SPN engineering team testing pile integrity with Seismic Integrity Tests on multiple piles on an actual project site
The Seismic Integrity Test can screen the integrity of large numbers of piles quickly before in-depth core drilling of only the suspect piles (photo: SPN Soil Engineering)

Summary

Reading Seismic Integrity Test results means looking at where reflected waves come from and in which direction. A sound pile shows a clear Toe Reflection at the design length and a flat middle section, while a reflection before the toe is a signal that needs further investigation.

Do not conclude that a pile is defective from the graph alone, because the same signal pattern can have several causes. Correct interpretation requires an engineer to consider the pile type, construction records and soil profile data together, and the seismic test does not indicate pile load capacity.

SPN Soil Engineering provides complete pile testing services, including Seismic Integrity Test, Dynamic Load Test (PDA) and Static Load Test to the relevant DPT and ASTM standards, with more than 20 years of experience in all 77 provinces of Thailand, and reports certified by a civil engineer licensed by the Council of Engineers Thailand (COE).