What Is a Pull-Out Test?

A pull-out test pulls an anchor or stud installed in concrete along its axis while recording both load and displacement, to check whether the fixing system carries its design load. The international reference standard is ASTM E488 — Standard Test Methods for Strength of Anchors in Concrete Elements. It is one type of non-destructive structural evaluation (NDE).

Field testing serves 2 main purposes:

  1. Proof Load Test — loading to a specified test load (e.g. 1.5–2 times the working load) to confirm the anchor "passes" without failure; used for acceptance of installed work
  2. Ultimate Load Test — loading until the anchor fails to find its actual ultimate capacity; used to derive design values or compare products
📚 Basic principles

Most on-site acceptance work is proof load testing. Anchors that pass remain in service, because the test load causes no permanent damage. The test records both "load" and "displacement" (load–displacement), rather than only whether the anchor pulls out or not.

⚠️ Looking for "pile uplift capacity" instead?

The pull-out test in this article tests anchors/studs embedded in concrete to ASTM E488. It is not the same as a pile uplift (tension) load test, which follows ASTM D3689 and pulls an entire pile up out of the ground. If you are looking for pile uplift testing (e.g. for solar farms, transmission towers or underground tanks), see What is a pile uplift (tension) test? instead.

Why Is a Pull-Out Test Needed?

Because the capacity of an anchor as installed can be far below the catalog value. Manufacturer values come from laboratory tests under controlled conditions, but real sites have variables that can reduce capacity:

  • Poor hole cleaning — concrete dust left in the hole can reduce the bond of a chemical anchor by as much as 40–60%
  • Insufficient embedment — the hole is drilled shallower than specified, or the stud is not inserted to the bottom
  • Degraded or incompletely mixed adhesive — stored at the wrong temperature, expired, or the hole not fully filled
  • Concrete strength below design, or cracks around the anchor location
  • Drilling into reinforcement and relocating without filling the original hole, which can be avoided by scanning for rebar with GPR before drilling
⚠️ An often-overlooked risk

In automated storage and retrieval systems (AS/RS) and high-bay racking, uplift at the column base comes from the overturning moment during an earthquake or a forklift impact. If even one base anchor pulls out, progressive collapse of the whole row can follow. Sample testing before use is therefore a standard requirement of leading racking manufacturers.

Which Types of Anchors Can Be Pull-Out Tested?

Both cast-in and post-installed anchors can be tested. ASTM E488 covers 4 main groups of anchoring systems, which carry load through different mechanisms:

← Scroll to see the full table →

TypeCharacteristicsLoad transfer
Adhesive / Chemical Anchor (bonded anchor)Threaded stud + epoxy/resin injected into a drilled holeChemical bond between the hole wall and the stud
Expansion Anchor (wedge/expansion anchor)Expansion sleeve presses against the hole wallFriction from expansion
Undercut AnchorExpanded tip in a hole reamed wider at the bottomMechanical interlock at the hole bottom
Cast-in-Place Anchor (cast in before pouring)J-bolts, embedded plates cast with the concreteBearing of the embedded part
💡 Note for chemical anchors

Chemical anchors must cure for the full time specified by the manufacturer before testing (curing time depends on temperature), and the standard sets a different support clearance for the test rig on chemical anchors than on other anchor types. See the clearance table in the next section.

What Equipment Is Used for a Pull-Out Test?

A field pull-out test rig has 6 main components, which apply load, measure load, measure displacement and transfer the reaction into the concrete:

Pull-out test rig at a storage racking column base: hydraulic cylinder, hand pump, pressure gauge and dial gauge
Field pull-out test rig — hollow-ram hydraulic cylinder, hydraulic hand pump, calibrated pressure gauge and a dial gauge on a magnetic stand, set up at a storage racking column base
  1. Hollow ram hydraulic cylinder — fitted over the loading rod connected to the stud
  2. Hydraulic hand pump with high-pressure hose and coupler
  3. Calibrated pressure gauge — converts pressure to tension via the calibration equation
  4. Dial gauge with 0.01 mm resolution on a magnetic stand — measures anchor displacement
  5. Reaction bridge — transfers the reaction into the concrete at the distance from the anchor required by the standard
  6. Loading rod and coupling nut — sized to develop the anchor's capacity with minimal elongation
3D model of a field pull-out test rig: a hollow-ram hydraulic cylinder on a reaction bridge pulls a threaded stud bonded with chemical adhesive in a concrete slab, with a hand pump, pressure gauge and dial gauge Conceptual 3D view of a concrete slab with a cut-away front showing a threaded stud embedded in a drilled hole surrounded by adhesive, with a dimension line for the effective embedment depth hef. Above the slab surface a coupling nut connects the stud to the loading rod. The loading rod passes through a steel reaction bridge whose two legs straddle the test point. On the bridge, a hollow-ram hydraulic cylinder sits over the loading rod with a lock nut on top. An orange arrow pointing up shows the axial tension along the stud; blue arrows pointing down at the bridge legs show the reaction transferred into the concrete. A dimension line between the bridge legs states not less than 2.0 times hef for chemical anchors. A high-pressure hose runs from the cylinder to a hydraulic hand pump with a pressure gauge, and a dial gauge with 0.01 millimeter resolution sits on a magnetic stand placed away from the bridge legs, its tip touching the coupling to measure anchor displacement. The box on the right lists the six components by their numbers in the figure and summarizes the minimum support clearances under ASTM E488: 2.0 hef for chemical anchors and 4.0 hef for other anchor types, as well as load measuring accuracy within plus or minus 2 percent. 3D model: field pull-out test rig Not to scale 1 2 3 4 5 6 hef Support clearance Axial tension on stud Square + concentric Slab cut away to show the embedded stud White arrows = reaction from bridge legs into concrete Legs set clear of anchor per standard, not confining it Dial gauge magnetic base sits outside the bridge Conceptual view · equipment not to scale Numbered parts 1 Hollow hydraulic ram Hollow ram over loading rod 2 Loading rod + coupler Joined to the test stud 3 Reaction bridge Carries reaction to concrete 4 Hand pump + gauge Calibrated with load cell 5 Dial gauge 0.01 mm Measures anchor movement 6 Threaded stud + adhesive hef = effective embedment Min. support clearance ASTM E488 (tension) Chemical 2.0 hef Other types 4.0 hef Load accuracy ± 2% of applied load (field)
3D model — field pull-out test rig, with the concrete slab cut away to show the threaded stud bonded with chemical adhesive and the effective embedment depth hef. The hollow-ram hydraulic cylinder pulls the rod through the reaction bridge while the dial gauge measures anchor displacement (conceptual view, equipment not to scale).

Minimum support clearance under ASTM E488 (tension):

← Scroll to see the full table →

Anchor typeSupport clearanceClearance to edge/test frame
Chemical anchor (adhesive)2.0 hef1.0 hef
All other anchor types4.0 hef2.0 hef

(hef = effective embedment depth of the anchor)

⚠️ Equipment must be calibrated

ASTM E488 requires load measuring equipment for field work to be accurate within ±2% of the applied load. The cylinder + pump + gauge set must be calibrated together against a reference load cell to obtain a conversion equation, e.g. actual load (kg) = gauge reading (bar) × 17.859 − 33.431, and the dial gauge must have a valid calibration certificate.

How Is a Step Loading Test Performed?

Start with a seating load of no more than 5%, then increase the load in steps of no more than 15% of the maximum test load, holding each step for 2 minutes. ASTM E488 allows 2 loading methods: continuous loading or incremental (step) loading. Field work favors step loading because readings can be taken from a manual gauge and the anchor's creep behavior can be seen at each step — the same principle as a static pile load test, where load is applied in steps and displacement is measured.

  1. Seating load — apply an initial seating load of no more than 5% of the maximum test load so that all components bed in, then zero the dial gauge (this value is the datum)
  2. Increase the load in steps — each step no more than 15% of the maximum test load
  3. Hold each step for 2 minutes — read the dial gauge at the start of the hold and at 2 minutes (the 2-minute value is the reported value)
  4. Record the start and end time of every step and plot the load–displacement curve continuously throughout the test

Example loading sequence (20 kN test load, 15% steps):

← Scroll to see the full table →

Step% of max. loadTension (kN)Hold (min)
Seating5%1—
115%32
230%62
345%92
460%122
575%152
690%182
7100%202

Total hold time is about 14 minutes per point (excluding setup and step changes).

💡 Reading tip

If the dial gauge needle keeps moving while the load is held constant, that is a sign of bond creep. If the displacement does not stop or the gauge pressure drops on its own, the bond is failing; record it as a bond failure even if the anchor has not visibly pulled out.

What Are the Failure Criteria?

ASTM E488 classifies tension anchor failures into 5 modes. Damage may occur in any one mode or several in combination:

  1. Shear-Cone Failure — the concrete fails as a shear cone around the anchor
  2. Concrete Cracking + Pull-Out — the concrete cracks around the anchor and the anchor then pulls out
  3. Pull-Out — the anchor pulls out of the hole
  4. Bond Failure — the bond between anchor and concrete fails, seen as continued displacement while the load is constant or dropping
  5. Steel / Hardware Fracture — any component of the anchoring system fractures, including nuts and fittings
2D diagram of the step loading sequence for a pull-out test to ASTM E488 and the five anchor failure modes The upper part is a stepped graph of tension load versus time, using the article's example test load of 20 kilonewtons. It starts with a seating load of no more than 5 percent, or 1 kilonewton, after which the displacement gauge is zeroed. The load is then increased in steps of no more than 15 percent: 15, 30, 45, 60, 75, 90 and 100 percent, equal to 3, 6, 9, 12, 15, 18 and 20 kilonewtons. Each step is held for 2 minutes. The orange dot at the end of each step is the reading at 2 minutes, which is used as the reported value. Total hold time is about 14 minutes per point. The lower part shows five small sections of the failure modes: first, a concrete cone breaks out around the anchor; second, the concrete cracks around the anchor and the anchor pulls out; third, the anchor pulls out of the hole with no concrete damage; fourth, the bond between anchor and concrete fails and the anchor keeps moving while the load is constant or dropping; fifth, the steel or fittings fracture. The bottom strip states that an anchor passes the proof load when it carries the full test load without any failure mode and displacement stabilizes while the load is held. Step loading and 5 failure modes of a pull-out test (2D) Not to scale A · Step loading Example test load 20 kN from the article 5 10 15 20 Tension (kN) Time (min) 15% 2 30% 4 45% 6 60% 8 75% 10 90% 12 100% 0 Start with a seating load ≤ 5% = 1 kN, then zero the dial gauge as the reference 2 min 1 Steps of ≤ 15% of max. test load 2 Hold each step 2 min Read at start + 2 min 3 Circle = reported value reading at 2 min 4 Total hold ~14 min/point excl. setup & step changes B · 5 failure modes per ASTM E488 · may occur alone or combined 1 Concrete cone Shear-Cone Concrete breaks out as a cone around anchor 2 Crack + pull-out Cracking + Pull-Out Concrete cracks around then anchor pulls out 3 Pull-out from hole Pull-Out Anchor slips out No concrete damage 4 Bond failure Bond Failure Movement continues at constant/falling load 5 Steel / part fracture Steel Fracture Stud, nut or coupler breaks before concrete Proof load PASS Carries the full test load with no failure mode, and displacement stabilizes while the load is held (no continued creep)
2D diagram — the upper part shows the step loading sequence for the article's 20 kN example test load (5% seating load, then steps of no more than 15%, each held for 2 minutes); the lower part shows conceptual sections of all 5 failure modes.
✅ "Pass" criteria for a proof load test

The anchor carries the full test load with no failure mode at all, and displacement stays within normal limits (no continued creep while the load is held).

How Many Points Should Be Tested?

ASTM E488 requires a minimum of 5 anchors per size to determine mean capacity (reducible to 3 if failure occurs in the steel). For statistical data, the number depends on the coefficient of variation (CoV):

← Scroll to see the full table →

CoV of test results (%)Minimum number of samples
Not more than 125
12 to 1510
More than 1530
CoV (%)  =  ( standard deviation ÷ mean ) × 100

In practice, acceptance testing usually specifies a sampling rate, such as 2–5% of all anchors or a minimum of 5–10 points, spread across highly loaded locations and work by different installation crews, depending on each project's specification.

Real Test Example: Racking Column Base Studs in a Warehouse

Case study from SPN testing: M16 × 300 mm threaded studs with 125 mm embedment in a concrete slab with f′c = 400 ksc, anchoring the column bases of an automated storage and retrieval system (AS/RS). 10 points were proof load tested to 20 kN by step loading in 15% increments, each held for 2 minutes.

Pull-out test setup at a racking column base in a warehouse
Actual test setup at a racking column base — a hydraulic hand pump connected by a high-pressure hose to the pulling cylinder at the column base, with a dial gauge measuring displacement
20 kN
Test load, all points
10/10
PASS · no failure
0.44 mm
Average displacement

← Scroll to see the full table →

ItemResult
Maximum test load20 kN (all points)
Failure modeNo failure at any of the 10 points
Displacement at maximum load0.08 – 0.61 mm (average 0.44 mm)
CoV of maximum load0.0%
VerdictPASS at all 10 points

Although every point passed, the displacements differed by a factor of 7 (0.08 vs 0.61 mm). This difference reflects the installation quality at each point, such as hole cleanliness and the integrity of the adhesive. A point with large displacement, even if it passes, gives the site supervisor grounds to go back and review the installation process for that batch. For how to read the load–movement curve and where the displacement values come from in detail, see How to interpret pull-out test results.

Best Practices

Test results are reliable when these 7 points are controlled, from before mobilization through to recording the results:

  1. Set the test load in writing before mobilization — the proof load comes from the designer or the manufacturer's specification, not from an agreement on site
  2. Check the calibration certificates every time — the cylinder + pump + gauge set is calibrated together, and the dial gauge has a valid calibration certificate
  3. Align the load square and concentric — the tension must act exactly along the stud axis; eccentricity causes bending moment and distorted readings
  4. Mount the dial gauge on a point unaffected by deflection — the magnetic base must be outside the zone of influence of the reaction bridge
  5. Respect the clearance for each anchor type — 2.0 hef for chemical anchors, 4.0 hef for other anchor types
  6. Record all data required by the standard — point location, time of each step, gauge reading at 2 minutes and failure mode, with photos of every point
  7. Never stand in line with the loading rod while loading — if the stud or coupler breaks, parts will fly off along the line of force; always wear safety glasses and use a shield

Summary

A pull-out test to ASTM E488 is the tool for confirming that chemical anchors and threaded studs as actually installed on site carry their design load, not just the catalog value. The keys to a reliable test are calibrated equipment, a correct step loading procedure (5% seating → steps of no more than 15% → 2-minute holds), complete load–displacement records and a number of test points consistent with statistical principles.

SPN Soil Engineering provides pull-out testing of chemical anchors, threaded studs and anchor bolts to ASTM E488, using hydraulic equipment calibrated against a reference load cell and dial gauges with calibration certificates. Results are reported with load–displacement curves and photos of every point, and reports are certified by a civil engineer licensed by the Council of Engineers Thailand (COE), with signature and registration number. We also provide other structural tests, such as the floor load test using real applied loads.

📌 Note

This article is provided as engineering knowledge. The test load, number of points and interpretation of results should follow the project specification and the judgment of a licensed engineer.