What Is a Pile Uplift Test?

A pile uplift test applies a vertical upward pull to the pile head in increments and measures the pile-head uplift at each increment. The result is a load–uplift curve that shows how much uplift the pile can resist and at what load it starts to move upward.

The reference standard is ASTM D3689/D3689M-25 Standard Test Methods for Deep Foundation Elements Under Static Axial Tensile Load, which specifies the setup, load increments, hold time per increment, measurements and reporting format. It is structured in parallel with ASTM D1143/D1143M-20e1 for compression testing; the difference is the direction of the load.

A steel reaction beam spanning over the test pile with both ends resting on supports, for a pile uplift test on site
Reaction beam system for an uplift test: the jack pulls the pile head up while transferring a downward load to two supports located away from the test pile (Photo: SPN Soil Engineering)

When a pile is pulled, the only resistance is the skin friction between the pile shaft and the soil plus the pile self-weight, because the pile toe provides no end bearing as it does in compression. The diagram below summarizes this principle in one view: the left panel shows the load path from the jack to the two supports, the right panel shows the curve used to read the results, and the bottom strip compares it with a pull-out test, which is the next topic.

Principle of the pile uplift test: load path from the jack to the supports, skin friction resisting uplift, a conceptual load–uplift curve, and how it differs from a pull-out test of chemical anchors A two-panel diagram with a bottom strip. The left panel is a side section of the uplift test system. A hydraulic jack sits on a bearing plate above a twin reaction beam. Tension bars connected to the test pile head pass through the gap between the beams and the center hole of the jack and are locked with nuts on the top steel plate. When the jack pushes the plate up, the pile is pulled up with force P, while the beam transfers a downward load to two supports, which are timber cribbing or concrete blocks. The pressure on the soil under each support is shown as a dashed bulb that must not reach the soil around the test pile, so the supports must be placed far enough from the test pile. A blue reference beam stands on its own stakes, independent of the loading system, with uplift gauges touching the plate on the pile head. In the soil, green arrows on the pile shaft point down to represent skin friction resisting uplift, together with the pile self-weight W. At the pile toe in dense sand a red cross indicates no end bearing when the pile is pulled. The right panel is a conceptual load–uplift curve using assumed values. The solid blue line is the stepwise loading of a pile that passes, reaching the maximum test load with total uplift below the specified limit line. The dashed orange line is unloading back to the residual uplift. The dashed red line is a pile whose curve breaks sharply upward before reaching the maximum test load, meaning the whole pile has started to move up. Below the chart, three things to check are summarized: total uplift at maximum load does not exceed the specified limit, residual uplift after unloading is within the limit, and the curve does not break before reaching maximum load. The bottom strip compares the uplift or tension test, which tests a whole pile in the soil per ASTM D3689/D3689M-25 at loads of tens to several hundred tonnes, with the pull-out test, which tests chemical anchors or threaded studs in concrete per ASTM E488 at loads from kilograms to a few tonnes; they are different tests. Uplift Test: load path · resistance · reading the curve Not to scale 1 Load path when pulling a pile up Jack pulls up → beam loads 2 supports Down load Down load W Pull P Hydraulic jack Lifts top plate Reaction beam (twin) Tension bar + nut To pile head via beam gap Support Cribbing/conc. block Indep. ref. beam + uplift gauge Enough gap Skin friction Down = resists uplift Pile weight (W) Also resists No end bearing Dense sand 2 Load–uplift curve Conceptual example · Assumed values Pull → Uplift → Spec limit Max test load 1 2 3 Sharp break Whole pile lifts Loading Unload Pile pulls out 3 checks 1 Total uplift at max load ≤ spec limit 2 Residual uplift within limit 3 No break before max load Limit values: see project spec Uplift / Tension Test Whole pile in soil · skin friction ASTM D3689/D3689M-25 · tens–hundreds of t ≠ Pull-out Test Anchor/stud in concrete · bond ASTM E488 · kg to a few t
Uplift test principle — left: the jack pulls the pile up and the reaction beam transfers a downward load to two supports that must be far enough from the test pile; the soil resists with skin friction (arrows pointing down) plus the pile self-weight, with no end bearing · right: the load–uplift curve and the 3 things to check, a conceptual example with assumed values, not actual test results · bottom: the uplift test (ASTM D3689/D3689M-25) and the pull-out test of chemical anchors (ASTM E488) are different tests

How Is an Uplift Test Different from a Pull-out Test?

An uplift test tests a whole pile embedded in soil, while a pull-out test tests chemical anchors or threaded studs embedded in concrete. The two terms are often used interchangeably, causing confusion, but they are different tests with different standards and different equipment.

← Scroll to see the full table →

Table 1 — Pile uplift test vs. chemical anchor pull-out test
TopicUplift / Tension Test (pile)Pull-out Test (chemical anchor/threaded stud)
What is testedA whole pile embedded in soilA chemical anchor or threaded stud embedded in concrete
What resists the loadSkin friction between the pile shaft and soil, plus the pile self-weightBond between the adhesive and the concrete and steel rod
StandardASTM D3689/D3689M-25ASTM E488
Load rangeTens to several hundred tonnesKilograms to a few tonnes
Loading systemHydraulic jack on a reaction beam resting on two supportsPortable pull tester placed directly on the concrete surface
Question it answersCan the foundation resist uplift from wind, buoyancy or overturning moment?Can the installed anchor carry the design tensile load?

In short, if you are looking for a test of whether a pile can be pulled out, this is the article to read. If you are looking for a test of chemical anchors or threaded studs embedded in concrete, read Pull-Out Test: A Guide to Tensile Pull-out Testing of Chemical Anchors and Threaded Studs per ASTM E488 instead.

Which Projects Need a Pile Uplift Test?

Uplift testing is needed for structures whose piles are pulled upward under some service conditions instead of only being pushed down. The main causes are wind uplift, buoyancy from groundwater, and moments that put the piles on one side of a foundation in tension.

  • Solar farm projects — wind under the panels lifts the structure while its self-weight is very low, so uplift often governs the design. See the full set of tests for a project in What Pile Tests Does a Solar Farm Project Need
  • High-voltage transmission towers and telecom towers — wind moment pushes one leg of the foundation down and pulls the other leg up
  • Large billboards — the same mechanism as towers: a large wind area but little self-weight
  • Basements and swimming pools resisting buoyancy — when the groundwater level is high, water pressure pushes the structure up and the piles anchor the structure to the ground
  • Tall buildings resisting wind or seismic moment — the outer piles of a group may become tension piles when the moment acts fully
  • Anchor piles for dams and waterfront structures

How Is an Uplift Test Set Up?

An uplift test setup has 3 parts: the loading system (hydraulic jack and tension bars), the reaction system (a reaction beam on two supports) and the measuring system (gauges on an independent reference beam). The components are similar to a compression test but reversed in direction. A compression test uses kentledge or adjacent piles as the reaction, whereas an uplift test needs a reaction beam spanning over the test pile that transfers the load to two supports.

Diagram of a pile uplift test system: the upper view shows the reference beam (red line) resting on independent blocks; the lower view shows the main reaction beam, two supports, the hydraulic jack and the tension bars connected to the test pile head
Diagram of the uplift test system components — the lower view shows the main reaction beam (Main Beam) transferring load to the two supports (Supporting Beam), with the hydraulic jack (Hydraulic Jack) pulling up the bars connected to the test pile head (TP). The upper view shows the reference beam (red line) for mounting the uplift gauges, resting on blocks independent of the loading system (Image: SPN Soil Engineering)

1. Reaction beam and supports

A steel beam spans over the test pile head, with both ends resting on supports, which may be adjacent piles, concrete blocks or prepared bearing pads. The distance from the supports to the test pile must be sufficient. If it is too close, the support pressure compresses the soil around the test pile and artificially increases the skin friction, so the measured value will be higher than the true value. The spacing used must follow the standard's requirements and the project test plan.

2. Pile-head connection

This is the weakest point of an uplift test, because the tensile force from the jack must be transferred directly into the pile. For concrete piles, reinforcement projecting from the pile head or a purpose-designed anchorage system is required. If the connection cannot carry the load, failure occurs at the pile head before the soil shows its true capacity, and the result will be lower than the true value and cannot be used for evaluation. See more on pile-head preparation in Pile head preparation before testing

3. Uplift measuring system

Displacement gauges are installed at the pile head and mounted on a reference beam that is independent of both the reaction beam and the supports. If the reference beam rests on anything that moves with the loading system, the readings will immediately be wrong.

Displacement gauges mounted on the reference beam at the pile head to measure uplift during an uplift test
The uplift gauges must be mounted on a reference beam that is independent of both the reaction beam and the supports; otherwise the readings will be in error (Photo: SPN Soil Engineering)

When all three parts are assembled, the actual site looks like the 3D model below. The trench in front is cut in the view only to show the pile and its skin friction. The right panel lists the testing sequence for one pile, from preparing the pile-head connection to reading the curve, together with a summary of projects that commonly require uplift testing.

3D model of a pile uplift test setup on site: a reaction beam on two supports, a jack pulling bars connected to the pile head, an independent reference beam with gauges, and a soil cut-away showing skin friction resisting uplift A conceptual 3D view of a soil block with a trench cut in front to expose the full length of the test pile. The upper layer is clay and the lower layer is sand, where the pile toe sits. On the ground surface, two stacks of crossed timber cribbing serve as supports to the left and right of the test pile, at a distance from it. A twin steel reaction beam rests on the supports and passes over the pile head. On the beam are a bearing plate, a hydraulic jack and a top steel plate. Two tension bars run from the pile head through the gap between the twin beams up to nuts on the top plate. An orange arrow pointing up represents the pull. In front, a blue reference beam stands on its own stakes, separate from the beam and supports, with arms reaching to two gauges at the pile head. At front left is a hydraulic pump with a pressure gauge, connected by hose to the jack. On the trench wall, green arrows on both sides of the pile point down to represent skin friction resisting uplift, and below the pile toe a red cross indicates no end bearing while the pile is pulled. Letters A to G identify the components below the image. The right panel lists six testing steps: prepare the pile-head connection; set up the reaction beam on supports far enough away; install the jack and tension bars; install the independent reference beam and gauges; apply the pull in increments, hold as specified, then unload; and read the load–uplift curve against the specified limits. The lower part of the panel summarizes projects that commonly need uplift testing: solar farms, transmission and telecom towers, large billboards, basements and swimming pools resisting buoyancy, tall buildings resisting moment, and anchor piles for dams and waterfront works; whether to test is decided by the design engineer. 3D model: uplift test setup on site Not to scale A B C D E F G Pull Clay Sand No end bearing A Reaction beam (twin steel) B 2 supports (timber cribbing) C Hydraulic jack + top plate D Tension bar + nut (to pile) E Indep. ref. beam + gauges F Hydraulic pump + gauge G Test pile (trench cut) Skin friction (down) Test sequence, 1 pile 1 Prepare pile-head joint Projecting rebar or anchor 2 Set reaction beam On supports far enough away 3 Install jack + bars Pull pile head vertically 4 Indep. ref. beam + gauges Not touching beam/supports 5 Pull in steps → unload Hold per spec · log uplift 6 Read curve → report Check vs. spec limits Typical uses Solar farm · wind uplift Power/telecom tower · wind Large billboard · high wind Basement/pool · buoyancy Tall building · wind/seismic Anchor pile · dam/waterfront Test or not → design engineer
3D model of an uplift test setup on site — twin steel reaction beam (A) on two timber cribbing supports (B), hydraulic jack (C) pulling bars connected to the pile head (D), independent reference beam with gauges (E), hydraulic pump (F), and the test pile (G) with a trench cut to show skin friction resisting uplift. The right panel shows the test sequence for one pile and projects that commonly require uplift testing — conceptual image, not to scale; actual component sizes and distances follow each project's test plan

Compression Piles vs. Tension Piles: What Is the Difference?

A compression pile uses both shaft friction and end bearing, while a tension pile relies only on shaft friction plus the pile self-weight. The results of the two tests therefore cannot substitute for each other.

← Scroll to see the full table →

Table 2 — Compression piles vs. tension (uplift) piles
TopicCompressionTension / Uplift
Resisting mechanismShaft friction + end bearing at the pile toeShaft friction + pile self-weight (no end bearing)
Effect on soil stressPushing compresses the soil around the pilePulling reduces the stress in the soil around the pile, so friction drops accordingly
Failure modes to watchPile toe plunges into the soil, or the pile crushes under compressionWhole pile pulls out, pile splice fails, or the pile-head concrete cracks at the connection
Typical comparative valueHigherClearly lower, especially for piles that rely mainly on end bearing
StandardASTM D1143/D1143M-20e1ASTM D3689/D3689M-25

For details of compression testing and how to read the curve, see Static Pile Load Test: Testing Pile Load Capacity by the Static Method. For an overview of all pile testing methods, see How many types of pile testing are there?

Why Is Uplift Capacity Lower than Compression Capacity?

Uplift capacity is lower than compression capacity for two main reasons: end bearing is lost, and skin friction in tension is lower than in compression.

First, end bearing is lost entirely. When a pile is pushed, the soil below the toe carries load together with the shaft friction. When the pile is pulled up, the toe lifts away from the soil and that contribution disappears, leaving only shaft friction plus the pile self-weight. Piles designed to rely mainly on end bearing, such as piles with their toe in dense sand or rock, show this difference most clearly.

Second, skin friction in tension is lower than in compression. Shaft friction depends on the normal stress the soil exerts against the pile surface. When the pile is pulled up, its cross-section tends to contract slightly (the Poisson effect) and the surrounding soil loosens, so the normal stress decreases and the friction actually mobilized is lower than in compression.

⚠️ Never calculate uplift capacity from compression capacity with a fixed factor

The ratio of uplift capacity to compression capacity depends on soil type, pile geometry, installation method and the share of end bearing in each project. There is no single factor that works everywhere. Design values must come from actual on-site testing or from analysis by the design engineer using that project's soil data.

What Should You Watch Out for in Uplift Testing?

Five issues commonly cause errors in uplift test results: accounting for pile self-weight, pile splices, the pile-head connection, the support spacing, and the time allowed for soil recovery.

Agree in advance whether to include the pile self-weight. The pile self-weight already helps resist the pull. Some specifications count it as part of the uplift resistance; others deduct it to look only at the soil capacity. The two approaches give different numbers, so this must be stated clearly in the test plan before starting, not interpreted afterward.

Pile splices are a risk point. Piles joined in segments with welded splices are designed mainly for compression. When pulled, the entire load must pass through the welds. If a weld is defective, the pile may break at the splice before the soil shows its true capacity. In this case, check the weld quality before deciding to test.

Pile-head concrete cracking at the connection. Concrete has very little tensile strength. Transferring tens of tonnes of tension into a concrete pile head requires a connection designed to transfer the load properly through the reinforcement. If the concrete cracks first, the test must stop and the result cannot be used to evaluate the soil capacity.

Reaction beam supports must be far enough away. As noted in the setup section, supports placed too close compress the soil around the test pile, so the measured skin friction is higher than actual, which is an error in the unsafe direction.

Time allowed for soil recovery after installation. As with compression testing, a pile that has just been driven or bored has not yet reached full capacity, because the surrounding soil is disturbed and excess pore water pressure has not yet dissipated. Testing too early gives values lower than the true capacity. The appropriate waiting time depends on soil type and installation method and should be set together with the designer.

How Do You Read Uplift Test Results?

Uplift test results are read from the load–uplift curve, in a similar way to a compression test curve, by checking 3 points

  1. Total uplift at the maximum test load must not exceed the specified limit
  2. Residual uplift after unloading must be within the limit
  3. Curve shape must not break sharply upward before reaching the maximum test load, because that shows the whole pile has started to move up

All limit values are set in the project specification. Example curve shapes for all three points are shown in the right panel of the principle diagram near the start of this article.

Failure in uplift is usually clearer than in compression, because once skin friction is fully mobilized the pile keeps moving up with almost no increase in load, giving a distinct break in the curve. In compression, the pile toe still carries part of the load even after skin friction is exhausted.

How Much Does an Uplift Test Cost, and What Needs to Be Prepared?

There is no fixed flat price for uplift testing, because it depends on the maximum pull required, pile type and size, the reaction beam and support arrangement, the number of test points and the site location, so it is priced per project based on the actual scope. Test prices exclude travel and equipment mobilization, which are charged extra based on the distance to site.

Information to prepare for a quick estimate: the design uplift load and maximum test load per specification; pile type, size and length; the pile-head connection detail; the space around the pile for placing supports; and the project location. Send the information to get a free quotation within 24 hours. SPN provides pile testing nationwide in all 77 provinces. See all services on the Pile Testing page.

⚠️ This article provides general information

This content explains the principles of uplift testing for general understanding only. The design uplift load, allowable uplift limits, whether to include the pile self-weight, the number of test points and the pile-head connection design must be specified by the design engineer of each project.