Turning a house into a café, converting a building into a warehouse, or adding a storey all change the loads from what was originally designed. This article summarizes what to inspect and with which methods. It is for general information only; the actual assessment must be made by the responsible engineer.

SPN engineers surveying and inspecting the concrete structure of an old building with non-destructive methods before an extension
Condition survey of an existing building structure using non-destructive testing (NDT) — the first step before deciding on an extension or change of use

Why Must Old Buildings Be Inspected Before an Extension?

Because the existing structure was designed for only one set of loads and uses. When you add a storey, add machinery, or change to a use with higher loads, the extra load flows down through the existing slabs, beams, columns, foundations and piles, so you need to know first whether each part still has enough spare capacity.

Old buildings also deteriorate over time: concrete carbonates, reinforcement starts to rust, or cracks appear. Inspection reveals the actual condition before you decide, reducing safety risks and budget overruns. In Thailand the reference framework is DPT standard 1902-62 of the Department of Public Works and Town & Country Planning, on the inspection, evaluation and strengthening of old building structures, which uses non-destructive testing together with core sampling as its main tools.

Section of an old building to be extended with a new storey, showing the load path from the added storey down through slabs, beams, columns, foundations and piles, with 3 inspection groups: concrete, reinforcement and foundations Conceptual section of an existing two-storey reinforced concrete building with three columns, two floor levels, and foundations and piles below ground. Above it, a new added storey is drawn in dashed orange lines. Orange arrows show load from the new storey flowing down the existing columns to the foundations and piles. The existing piles carry a question mark because their length is unknown. Blue label A on the columns and slabs indicates the concrete inspection group. Orange label B on the slab soffit, which shows rust stains and spalled concrete, indicates the reinforcement inspection group. Green label C at the foundation indicates the foundation inspection group; beside the foundation are a borehole with a tube for Parallel Seismic and a soil investigation borehole. On the right, a box summarizes the three groups. Group A, concrete: Rebound Hammer, UPV, Concrete Core and Impact Echo, indicating compressive strength, uniformity, voids and thickness. Group B, reinforcement: Cover Meter or GPR, Half-Cell Potential and Carbonation Test, indicating bar location, cover and corrosion risk. Group C, foundations: Parallel Seismic per ASTM D8381 and soil investigation, indicating foundation depth and bearing strata. The bottom strip summarizes the sequence: NDT for a broad survey first, cores to confirm suspect spots, then the engineer assesses whether the new load can be carried or strengthening is needed. Old building before extension: load path and what to check where Not to scale Load from new storey New storey (dashed) ? ? Upper slab 2F slab Column + beam Footing Pile + soil Exist. 2F Exist. 1F A A B B C C A Concrete: enough strength? Rebound Hammer · UPV Concrete Core · Impact Echo Shows: strength, uniformity voids, slab thickness B Rebar: rusting yet? Cover Meter / GPR Half-Cell · Carbonation Test Shows: bar location, cover corrosion risk C Foundation: depth? soil OK? Parallel Seismic (ASTM D8381) Soil investigation (Soil Boring) Shows: exist. fdn/pile depth and bearing strata Conceptual, not any real building Points & methods set by engineer 1 NDT broad survey first Plan all 3 groups 2 Core to confirm suspects Destructive only as needed 3 Engineer assesses OK, or strengthen
Conceptual section of an old building to be extended with a new storey. Orange arrows show the additional load flowing down the existing columns, foundations and piles. Labels A, B and C are the concrete, reinforcement and foundation inspection groups (Image: SPN Soil Engineering)
📚 Basic principles

Assessing an old building is not about a single spot; it must combine data from 3 groups — concrete, reinforcement and foundations — so the engineer can see the remaining capacity of the whole system before new loads are added.

Which Methods Should Be Used to Inspect the Concrete?

The concrete group uses 4 methods to assess the strength and quality of the existing concrete.

  • Rebound Hammer — a quick survey of concrete surface uniformity. The result is a surface hardness index and must be calibrated against cores before being used to estimate compressive strength.
  • UPV — checks internal uniformity and locates voids and cracks
  • Concrete Core Test — confirms the actual compressive strength at specific spots and is used to calibrate NDT
  • Impact Echo — measures slab thickness and detects delamination when only one side is accessible

The common approach is to use NDT for a broad survey first, then take cores to confirm suspect spots, giving complete data with as little destructive testing as possible.

The SPN team setting up a core drill above the ceiling of an existing building to sample concrete at a hard-to-reach spot
Coring to confirm the compressive strength of an existing building's concrete at a hard-to-reach spot above the ceiling — the SPN team can test slabs, columns and beams
Scanning for reinforcement location and concrete cover in an existing building structure with GPR/Cover Meter
Scanning for reinforcement location and concrete cover (Cover Meter/GPR) — key data for assessing corrosion in old buildings

How Should Reinforcement and Corrosion Be Inspected?

The reinforcement group uses 3 methods to assess bar locations and the durability of the structure.

  • Cover Meter / GPR — locates bars, bar spacing and concrete cover
  • Half-Cell Potential — assesses the probability that reinforcement is actively corroding
  • Carbonation Test — measures carbonation depth relative to cover, indicating the risk of reinforcement rusting

This group of data is especially important in old buildings, coastal buildings, and buildings with visible rust stains or spalled concrete.

SPN engineers scanning for slab reinforcement in an existing building with a rebar scanner
The SPN team scanning slab reinforcement in an existing building with a rebar scanner — baseline data before assessing corrosion and locating core points
⚠️ Points to watch

If you see rust stains, spalled concrete or exposed bars, do not ignore them; they may indicate that carbonation or chlorides have already reached the steel. Have an engineer assess the structure before adding load.

How Should Existing Foundations Be Inspected When There Are No Construction Drawings?

When there is no data on the existing piles, inspect two aspects of the foundation together: the pile depth and the supporting soil layers.

The results of these two help the engineer assess whether the existing foundation can carry the new load and, if strengthening is needed, how it should be designed.

Parallel Seismic testing to find the depth of existing foundations and piles in an old building without construction drawings
Parallel Seismic Test (ASTM D8381) — determining the depth of existing foundations/piles when there are no construction drawings, before strengthening design

Summary: How to Inspect an Old Building Before an Extension

A single building usually needs several methods combined. The model below shows where each method is actually applied, and the table summarizes what each group tells you.

3D model of an existing two-storey reinforced concrete building to be extended with a new storey, showing the locations of 9 inspection methods grouped into concrete, reinforcement and foundations (conceptual view) Conceptual 3D view of a two-storey reinforced concrete frame with the walls removed to show the columns and slabs, standing on a soil block cut away to show the foundations and piles under the front row of columns. Above the existing roof, a new added storey frame is drawn in dashed orange lines, with arrows showing the added load on the existing structure. Number 1 is at a ground-floor column where an engineer is using a Rebound Hammer. Number 2 is at the middle column with UPV transducers on two sides. Number 3 is a core drill on the upper slab. Number 4 is an Impact Echo test point on the upper slab. Number 5 is a GPR or Cover Meter scanner on the upper slab with scan lines. Number 6 is a Half-Cell Potential measuring point at the edge of the second-floor slab, which has rust stains. Number 7 is a Carbonation test point on a second-floor column. Number 8 is a tube in a borehole beside the foundation for Parallel Seismic, and number 9 is a soil boring tripod beside the building. The existing piles carry a question mark because their length is unknown. The box on the right lists all nine methods by group. Concrete group: Rebound Hammer for surface uniformity, UPV for internal quality, voids and cracks, Concrete Core to confirm actual compressive strength at specific spots, and Impact Echo for slab thickness and delamination. Reinforcement group: Cover Meter or GPR for bar location and cover, Half-Cell to assess the likelihood of corrosion, and Carbonation for depth relative to cover. Foundation group: Parallel Seismic for existing pile depth, and Soil Boring for the supporting soil layers. 3D model: 9 inspection points in an old building Not to scale ? ? ? 1 2 3 4 5 6 7 8 9 New added storey (dashed) added load to exist. columns + fdn Label: blue = concrete orange = rebar · green = fdn Walls removed to show structure · ? = existing pile length unknown Conceptual, not any real building 9 points in 3 groups Concrete 1 Rebound Hammer Surface uniformity 2 UPV Interior, voids, cracks 3 Concrete Core Actual strength at a spot 4 Impact Echo Slab thickness, delamination Rebar and corrosion 5 Cover Meter / GPR Bar location, cover 6 Half-Cell Potential Likelihood of corrosion 7 Carbonation Test Depth vs cover Footing 8 Parallel Seismic Exist. pile/fdn depth 9 Soil Boring Bearing soil layers
Conceptual 3D model of 9 inspection methods in an old building before extension. Blue labels are the concrete group, orange the reinforcement group and green the foundation group. The actual number of points is set by the engineer according to the purpose (Image: SPN Soil Engineering)

← Scroll to see the full table →

Inspection groupMethods usedWhat it tells you
ConcreteRebound, UPV, Core, Impact EchoCompressive strength, uniformity, voids, thickness
RebarCover Meter/GPR, Half-Cell, CarbonationBar location, cover, corrosion
FootingParallel Seismic, Soil BoringFoundation depth, bearing soil layers

All inspection results are data for a civil engineer to assess the strength of the existing structure and design strengthening if necessary. Reports are certified by a civil engineer licensed by the Council of Engineers Thailand (COE), with signature and registration number, and can be used as supporting documents for submissions to the relevant authorities.

✅ Getting the most out of it

Planning all 3 groups of inspection in a single visit reduces travel costs and gives the engineer complete data for the assessment. We recommend having the engineer set the number of points and methods to suit the purpose of the extension from the outset.