The method suits older buildings, coastal structures, car parks and structures showing rust stains or spalled concrete, helping to locate high-risk areas before the damage spreads. It is one type of non-destructive structural evaluation (NDE). This article explains the measuring principle, the site procedure, how to interpret readings against the ASTM C876 criteria, and the limitations you should know before using the results to make repair decisions.
How Does Half-Cell Potential Work?
Half-Cell Potential measures the potential difference between the reinforcing steel and a reference electrode placed on the concrete surface. When the reinforcement corrodes, an electrochemical reaction takes place, so the potential of the steel in the corroding area (anode) differs from that of the sound area (cathode). The measurement uses a reference electrode, such as copper/copper sulfate (Cu/CuSO₄), placed on a pre-wetted concrete surface, with the other lead connected to the reinforcement.
A voltmeter reads the potential in millivolts (mV). Strongly negative values indicate a high tendency for corrosion in that area. Readings from many points are then plotted as a potential map to show the distribution of high-risk areas.
In practice, readings are taken on a grid covering the suspect area. The images below show the site measurement as a 2D model (side section) and a 3D model — from the lead connection to the reinforcement and the reference electrode moved point by point, to the relationship between the readings and the area where the steel is corroding.
What Are the Site Steps for Half-Cell Potential Measurement?
Site measurement involves six steps. The steps that most affect reliability are connecting the lead to the reinforcement and wetting the surface.
- Locate the reinforcement — use a Cover Meter / Rebar Scanner to find the bar positions and cover, so you can choose the break-out point and lay out the grid
- Break out the concrete at one point and connect the lead to the reinforcement — clean the bar to bright metal before clamping the lead, and check that the steel in the test area is electrically continuous
- Mark the measurement grid on the surface — e.g. every 0.5–1.0 m, depending on member size and the resolution required
- Wet the concrete surface — to complete the measuring circuit and obtain stable readings
- Place the reference electrode at each grid point and record the mV value — wait for the reading to stabilize before recording each point
- Produce the potential map and interpret it — divide it into color bands by the criteria, then choose points to open up and confirm the actual condition of the steel
How Do You Interpret Half-Cell Potential Readings?
Potentials are interpreted as ranges of corrosion probability. ASTM C876 gives the following reference criteria when a copper/copper sulfate reference electrode (Cu/CuSO₄, or CSE) is used:
← Scroll to see the full table →
| Potential (mV, vs CSE) | Probability of corrosion |
|---|---|
| More positive than −200 | Low probability of corrosion (less than 10%) |
| −200 to −350 | Uncertain |
| More negative than −350 | High probability of corrosion (greater than 90%) |
The key point is that Half-Cell Potential indicates the "probability" that corrosion is occurring; it does not indicate the "corrosion rate" or the amount of steel lost. Interpretation should also consider the distribution pattern of readings (gradient) rather than relying on a single number, and if another type of reference electrode is used, the readings must be converted to a CSE basis before comparing them with the criteria in the table.
Areas where the potential changes steeply (high gradient) usually indicate the extent of corrosion better than any single reading. Measurements should therefore be taken on a grid and plotted as a potential map to assess the overall picture.
When Is Half-Cell Potential Used?
Half-Cell Potential is used when the reinforcement is suspected to be rusting but the full extent of the damage cannot be seen from the surface. Common cases include:
- Buildings or structures with rust stains running down the surface, or spalled concrete exposing the steel
- Coastal structures or structures exposed to salt spray, which are at risk of chloride ingress
- Car parks, roof decks, bridges and areas that are regularly wet and dry
- Condition assessment of older buildings before repair or renovation
Which Tests Should Be Used Together with Half-Cell?
Half-Cell shows "where the risk is" but not the cause. A complete corrosion assessment therefore combines several methods, each answering a different question.
← Scroll to see the full table →
| Test | What it answers | Test type |
|---|---|---|
| Half-Cell Potential | Where the steel is likely to be corroding | Non-destructive; surface opened only at the connection point |
| Carbonation Test | Has the loss of alkalinity reached the steel? | Semi-destructive; needs a freshly broken surface |
| Chloride Content Test | How much chloride has accumulated at the steel level? | Semi-destructive; concrete powder collected for analysis |
| Cover Meter | Where is the steel, and how much cover remains? | Non-destructive |
| Opening up (break-out inspection) | Is the steel actually rusted, and how much section remains? | Locally destructive; used to confirm results |
In addition, concrete electrical resistivity may also be measured to help assess the severity of corrosion.
What Are the Limitations of Half-Cell Potential?
The main limitations are that readings are sensitive to the condition of the concrete, and the result only indicates probability — it does not confirm how much steel has been lost. Factors to watch for include:
- Concrete moisture — very dry or high-resistivity concrete distorts the readings, so the surface must be wetted per the standard method
- Coatings or paint — non-conductive coatings interfere with the measurement; the surface must be opened to the concrete at each measurement point
- Electrically discontinuous reinforcement — readings will not represent the steel across the whole area; continuity must be checked before measuring
- No rate or amount — it does not tell you how fast the steel is corroding or how much section has been lost
At critical points, the concrete should therefore be opened up (break-out inspection) to confirm the actual condition of the steel, and an engineer should assess the results together with other data.
Half-Cell Potential is good at locating high-risk areas, but it does not tell you how much section the steel has lost. Confirming critical points by opening up, and an assessment by a licensed engineer, are therefore essential before making repair decisions.
SPN provides Half-Cell Potential measurement with potential maps and reports certified by a civil engineer licensed by the Council of Engineers Thailand (COE), complete with signature and license number.