No soil boring results: what values does the law allow?
The 2023 Foundation Ministerial Regulation sets out a straightforward principle: the allowable bearing pressure of foundation soil, or the resistance of a pile, must have a documented basis. With a soil investigation report, the engineer can calculate from actual soil properties. Without one, the law only allows values no higher than those prescribed in Clauses 7–9 of the regulation (for buildings outside the mandatory group under Clause 5). These values are deliberately set low for safety, because no one can confirm what the soil beneath the building is really like.
The values prescribed by the regulation can be summarized from the text as follows (soil types are defined by SPT N per 300 mm, undrained shear strength su, or water content w, per Clause 2):
← Scroll to see the full table →
| Soil type as defined in the regulation | Applicable up to | No. |
|---|---|---|
| Sound rock with no fissures, cracks or cavities | 250 kPa (25 t/m²) | 7 (1) |
| Dense gravel or hardpan (stiff clay N > 30) | 200 kPa (20 t/m²) | 7 (2) |
| Stiff clay (N > 8–30 or su > 50 kPa), dense sand, or medium-dense gravel | 100 kPa (10 t/m²) | 7 (3) |
| Medium stiff clay (N > 4–8 or su 25–50 kPa), medium-dense sand, or loose gravel | 50 kPa (5 t/m²) | 7 (4) |
| Soft clay (N ≤ 4 or su 12.5–25 kPa) not located at river mouths, bay mouths, sea coasts, mangroves, or areas where clay may become very soft | 20 kPa (2 t/m²) | 7 (5) |
| Pile skin friction in clay (outside the above areas), depth ≤ 10 m / 10–15 m / over 15 m | 500 / 500 + 160 × y / 1,300 kg/m² | 8 |
| Very soft clay (w > 100% or su < 12.5 kPa) | su ≤ 4 kPa or friction ≤ 160 kg/m² | 9 |
In Clause 8, y is the length of the pile portion deeper than 10 m but not deeper than 15 m below the original ground level. Clause 9 also requires long-term settlement to be considered. For details of application, rely on the text published in the Royal Gazette; the design engineer is responsible for applying the values correctly (for background, see What is soil bearing capacity?)
How does soil boring differ from using the cap values?
← Scroll to see the full table →
| Issue | No boring (legal cap values) | Boring (values from actual investigation) |
|---|---|---|
| Design soil bearing value | Low (conservative) | Based on actual soil properties, usually higher |
| Spread footing size | Larger to compensate for low values | Suited to actual soil |
| Pile length/number | More allowance needed | Can be designed accurately |
| Risk of unexpected soil layers | High (no data) | Low (actual boring log available) |
| Total foundation cost | Usually higher | Usually lower, even including soil boring cost |
📌 Note: Actual figures for each project depend on soil conditions, building size and the responsible engineer's design. This table illustrates the principle of comparison only. This article is a summary for understanding, not legal or project-specific engineering advice.
When does skipping soil boring usually cost more? 3 situations
1. Soft-soil areas, such as the Central Plains lowlands
If you design with the soft-clay cap value, the footings and piles will carry a large allowance, even though actual boring may find dense sand or stiff soil at a shallower depth than expected, allowing shorter piles to be chosen.
2. Newly filled land
There is no way to know the properties of fill without testing. Assuming the lowest value is the only option the law leaves open, which automatically means the most expensive design.
3. Heavy buildings or buildings with basements
The heavier the load on the foundations, the more the gap between the "cap value" and the "actual value" turns into money spent on piles, concrete and steel.
Soft-soil areas need even more care, because the law separates ordinary soft clay (Clause 7) from very soft clay near river mouths and coasts (Clause 9), which allows even lower values. The 3D view below shows how the usable values change from upland areas to the coast.
Which buildings cannot use the cap values?
Remember that high-rise buildings, extra-large buildings, large controlled-use buildings of 4 storeys or more, and buildings of 4 storeys or more in housing estate projects have no choice — the regulation already requires a soil investigation report of at least 3 investigation points to accompany the design calculations (see details of the mandatory building groups in the 2023 Foundation Ministerial Regulation summary and guidance on number and depth of boreholes). Clauses 7–9 state clearly that they apply to buildings "other than buildings under Clause 5", so the question of "to bore or not to bore" only concerns small to medium-sized buildings.
Summary: cap values are allowed, but usually cost more than soil boring
The 2023 Foundation Ministerial Regulation does not prohibit building without soil boring, but it "charges interest" on not knowing by forcing the use of the lowest soil bearing values. Soil investigation is therefore not an added cost but an investment that usually pays back right away at the foundation design stage — spend tens of thousands of baht to avoid hundreds of thousands in extra allowance.